需要金幣:![]() ![]() |
資料包括:完整論文 | ![]() |
![]() |
轉(zhuǎn)換比率:金額 X 10=金幣數(shù)量, 例100元=1000金幣 | 論文字?jǐn)?shù):19262 | ![]() | |
折扣與優(yōu)惠:團(tuán)購最低可5折優(yōu)惠 - 了解詳情 | 論文格式:Word格式(*.doc) | ![]() |
摘要:本設(shè)計(jì)是十三層陽光大廈酒店的建筑給排水設(shè)計(jì),主要包括給水系統(tǒng)、排水系統(tǒng)、消防系統(tǒng)及熱水系統(tǒng)四個(gè)部分。 給水系統(tǒng)采用分區(qū)供水,一到七層為低區(qū),由市政管網(wǎng)直接供水。八層到十三層為高區(qū),采用下行上給的供水方式;排水系統(tǒng)采用的是污、廢分流制,底層單獨(dú)排水,排水立管僅設(shè)伸頂通氣管,污水再經(jīng)化糞池處理后排向市政污水管網(wǎng);消防系統(tǒng)設(shè)計(jì)成消火栓滅火系統(tǒng),火災(zāi)初期10min的水由消防水箱供給,正常供水由消防水泵從貯水池內(nèi)抽取。熱水采用的是封閉式機(jī)械半循環(huán)系統(tǒng),分區(qū)情況和冷水系統(tǒng)一致。給水管和排水管分別采用PP—R管和UPVC管,消防系統(tǒng)和熱水系統(tǒng)都采用鍍鋅鋼管。 設(shè)計(jì)過程進(jìn)行了各系統(tǒng)方案的確定、平面布置和計(jì)算,以及各種設(shè)備的選型。最后用CAD繪制了各個(gè)系統(tǒng)的平面施工圖和系統(tǒng)軸側(cè)圖。 關(guān)鍵詞 高層建筑;給水系統(tǒng);排水系統(tǒng);消防系統(tǒng);熱水供應(yīng)系統(tǒng)
Abstract:This design is a 13 layers buildings of the public residence building to , completing the design of the water supply system and draining the system, fire fight system, the hot water system and the system of the roof rain water. The water supply system adoption cent area supply water. 1-7 low areas of the layers is taken care of the direct water supply by the municipal pipe net. The eighth layer to the 13th layer is high area, adoption north bound descend to of water supply method, pump to supply water to a water tank of the roof from the water supply of the underground garage, then be taken care of the net water supply toward high area by a water tank; Drain the system adoption is a dirty water, the waste water confluence system, the first floor drains alone, draining to sign the tube to establish to stretch the crest to ventilate the tube only, the dirty water was handle by septic tank again rear row to municipal soil pipe net; The fire fight system design becomes to eliminate the fire to bolt to extinguish fire the system, a fire water of the early 10 mines is supply by the fire fight water tank, normal the water supply be pumped by the fire fight Pump from the Saving pond ;The hot water system divides the area circumstance in accordance with the cold system of water, the cold water passes to give or get an electric shock after the heating apparatus concentration heat, again from promote the pump to provide to go together with the pipe line net, The hot water adopt is the closing type machine half circulatory system; The rain water adoption is inside drain the system, rain water direct row to municipal soil pipe net.The water pipe and drain pipes respectively adopt the PP- R tube and the UPVC tubes , the fire fight system and the hot water systems all adopt to plate the zinc steel pipe. In the designation process ,I carried on settling each system project , the flat surface arranges and computing, and chousing the type of various equipments , and do the great engineering budget estimation and establishment procedure of the Excel. finally,Drew the flat surface construction diagram and the system stalk side diagrams of each system with the CAD. Keywords high building water supply system wastewater system fire system hot water supply system
|