需要金幣:![]() ![]() |
資料包括:完整論文 | ![]() |
![]() |
轉(zhuǎn)換比率:金額 X 10=金幣數(shù)量, 例100元=1000金幣 | 論文字?jǐn)?shù):21887 | ![]() | |
折扣與優(yōu)惠:團(tuán)購最低可5折優(yōu)惠 - 了解詳情 | 論文格式:Word格式(*.doc) | ![]() |
摘要:徐州市交通局商住樓是一棟14層的綜合性民用建筑,該建筑包括一層地下車庫、三層商鋪以及若干層住宅。本次設(shè)計(jì)的主要內(nèi)容即完成該建筑的建筑給排水工程設(shè)計(jì)工作。 此次設(shè)計(jì)的主要內(nèi)容包括:1)給水系統(tǒng):包括室內(nèi)外的冷水給水系統(tǒng)。2)熱水系統(tǒng):包括住宅淋浴用水等。3)排水系統(tǒng):包括生活污廢水系統(tǒng)、雨水系統(tǒng)。4)消防系統(tǒng):包括消火栓系統(tǒng)和自動噴淋系統(tǒng)等。 給水系統(tǒng)由外圍市政給水供水管網(wǎng)提供水源,根據(jù)市政管網(wǎng)常年資用水頭將本建筑給水分區(qū)分為低區(qū)與高區(qū),分別由市政管網(wǎng)直接供水以及高位水箱減壓閥減壓供水。 熱水系統(tǒng)根據(jù)給水分區(qū)進(jìn)行供水,熱水由該建筑旁表壓為0.20Mpa的蒸汽熱源提供。 排水系統(tǒng)根據(jù)本建筑的污廢水成分,擬采用污廢水合流制的排水方式,集中排放到化糞池中處理,之后排入市政排水管網(wǎng)。雨水系統(tǒng)采用重力流排水方式,直接將雨水排入市政管網(wǎng)。 消防系統(tǒng)按照高層建筑“自救為主”的原則,根據(jù)高層建筑防火設(shè)計(jì)規(guī)范進(jìn)行設(shè)計(jì),室內(nèi)外消火栓布置以及自動噴淋系統(tǒng)的設(shè)定均嚴(yán)格按照防火規(guī)范進(jìn)行。 關(guān)鍵詞 高層建筑;建筑給排水工程;自動噴淋系統(tǒng);水泵
Abstract:Xuzhou Communications Bureau Rent All Serviced Apartments is a 14-storey integrated civil construction of the building, including a layer of underground garage, three shops and several layers of residential. The main content of the design is to complete the construction of the building Water and Wastewater Engineering design work. The main content of the design include: 1) water supply systems: the cold water supply system, including indoor and outdoor. 2) The hot water system: including residential shower water. 3) drainage systems: the sewage and waste systems, the rainwater systems. 4) Fire System: including hydrant systems and automatic sprinkler system. Municipal water supply system from the periphery to provide water supply pipe network, according to the municipal water pipe network perennial owned the building water partition head will be divided into low areas and high areas, respectively, by the municipal pipe network water supply tank valve and high pressure water. Hot water system based on water partition water, hot water by the side of the building steam gauge pressure of 0.20Mpa to provide a heat source. Drainage system in accordance with the construction of the sewage effluent composition, the proposed combined system of sewage and waste water drainage patterns, concentrated discharge to septic tank treatment, then discharged into the municipal sewer. Rainwater system uses gravity flow drainage patterns, rainwater directly into the municipal pipe network. High-rise building fire protection system in accordance with the "self-based" principle, according to the high-rise building fire safety design specifications for the design, layout, and indoor and outdoor fire hydrant sprinkler system settings are carried out in strict accordance with fire safety regulations. Keywords High-rising building Building water supply and drainage works Automatic sprinklers system Pumps
|