需要金幣:![]() ![]() |
資料包括:完整論文 | ![]() |
![]() |
轉(zhuǎn)換比率:金額 X 10=金幣數(shù)量, 例100元=1000金幣 | 論文字?jǐn)?shù):7389 | ![]() | |
折扣與優(yōu)惠:團(tuán)購最低可5折優(yōu)惠 - 了解詳情 | 論文格式:Word格式(*.doc) | ![]() |
摘要:此次畢業(yè)設(shè)計為XX學(xué)院新校區(qū)行政樓,所在地為重慶市大學(xué)城。該工程的建設(shè)單位為XX學(xué)院,施工圖紙齊全。本工程的土建預(yù)算部分包括基礎(chǔ)工程、主體結(jié)構(gòu)工程、屋面工程及圖紙中說明的部分裝飾工程。基礎(chǔ)結(jié)構(gòu)采用人工挖孔樁基礎(chǔ),建筑面積為7299.56平方米,層高為24.9米,六層公共建筑,框架結(jié)構(gòu),抗震設(shè)防烈度為6度,耐火等級二級,工程類別三類。 該投標(biāo)文件的編制是以XX學(xué)院新校區(qū)行政樓的施工合同以及施工設(shè)計圖紙,國家和地方現(xiàn)行的一系列施工和技術(shù)規(guī)范、標(biāo)準(zhǔn)等為依據(jù)。 此次畢業(yè)設(shè)計首先熟悉XX學(xué)院新校區(qū)一教學(xué)樓設(shè)計圖紙,運用軟件為廣聯(lián)達(dá)鋼筋GGJ2009計算該棟建筑的鋼筋量、其次運用廣聯(lián)達(dá)圖形算量軟件GCL2008計算工程量,最后運用廣聯(lián)達(dá)計價軟件GBQ4.0套取定額,計算工程的總造價為9,079,002.56元。 關(guān)鍵詞:投標(biāo) 工期 預(yù)算
ABSTRACT:This works for Chongqing City Management College new campus administration building, located in Chongqing University City. The project construction unit of Chongqing City Management College, construction drawings are complete. The portion of the budget, including the civil engineering infrastructure projects, the main structural engineering, roofing works and drawings illustrate some decoration works. Infrastructure uses a hand-dug pile foundation construction area of ??7299.56 square meters, the height of 24.9 meters, six public buildings, frame structure, seismic fortification intensity is six degrees, fire resistance rating of two, three project categories. The tender documents are compiled based on Chongqing City Management College new campus administration building construction contracts and construction design drawings, a series of existing national and local construction and technical specifications and standards as the basis. The first graduation familiar Chongqing City Management College new campus a teaching building design drawings, the use of software Glodon reinforced GGJ2009 calculate the amount of steel buildings, followed by the use of Glodon count the amount of graphics software GCL2008 calculate quantities last use Glodon fixed pricing software GBQ4.0 taking calculated the total cost of the project is 9,079,002.56 dollars. Keywords: Tender;period;budget
|