需要金幣:![]() ![]() |
資料包括:完整論文 | ![]() |
![]() |
轉(zhuǎn)換比率:金額 X 10=金幣數(shù)量, 例100元=1000金幣 | 論文字?jǐn)?shù):8046 | ![]() | |
折扣與優(yōu)惠:團(tuán)購(gòu)最低可5折優(yōu)惠 - 了解詳情 | 論文格式:Word格式(*.doc) | ![]() |
摘要:本工程為XX學(xué)院宿舍樓II標(biāo)段工程,所在地為重慶市沙坪壩區(qū)虎溪鎮(zhèn)大學(xué)城。該工程的建設(shè)單位為XX學(xué)院,工程由大地建筑事務(wù)所設(shè)計(jì),施工圖紙齊全?;A(chǔ)結(jié)構(gòu)采用人工挖孔樁基礎(chǔ)。本工程為框架結(jié)構(gòu),結(jié)構(gòu)安全等級(jí)為二級(jí),抗震設(shè)防烈度為六度,建筑場(chǎng)地類(lèi)別為III類(lèi),框架抗震等級(jí)為四級(jí)。 我國(guó)在建設(shè)工程領(lǐng)域?qū)嵭薪ㄔO(shè)工程項(xiàng)目招投標(biāo)制度。2008年7月15國(guó)家標(biāo)準(zhǔn)《建設(shè)工程工程量清單計(jì)價(jià)規(guī)范》(GB50500-2008)的頒布,標(biāo)志著我國(guó)計(jì)價(jià)模式轉(zhuǎn)向由企業(yè)自主報(bào)價(jià)的計(jì)價(jià)模式?;谝陨媳尘?,本次根據(jù)XX學(xué)院宿舍樓II標(biāo)段工程項(xiàng)目的設(shè)計(jì)圖紙,編制商務(wù)標(biāo)。本商務(wù)標(biāo)從企業(yè)自身水平出發(fā),結(jié)合實(shí)際工程情況,并參考甲方提供的工程量清單及地質(zhì)勘查報(bào)告,提供以工程量清單計(jì)價(jià)形式表現(xiàn)的投標(biāo)報(bào)價(jià)。 由于本工程工期緊臨近開(kāi)學(xué),為使新一批學(xué)生能按時(shí)入住,我方承諾,在建筑過(guò)程中將應(yīng)用新技術(shù)、新工藝、新材料、新設(shè)備,嚴(yán)格按照ISO9002質(zhì)量體系運(yùn)行,力保在規(guī)定工期范圍內(nèi)完成本工程。 關(guān)鍵詞:工程概況 工程量清單 投標(biāo)文件 保證工期
ABSTRACT:This works for the Chongqing City Management College dormitory II tenders tender documents, Shapingba area of Chongqing is located in Tiger Town, University City. The project construction units for the Chongqing City Management College, engineering, architectural design by the architectural firm earth, the design, construction drawings complete. Infrastructure, the use of hand-dug pile foundation. The upper part of the main for the brick, local framework structure, the structural safety of grade III, for the six seismic fortification intensity, type of construction work for the four categories. Implemented in the field of construction engineering construction project bidding system. July 2008 15 Country standard "construction project BOQ pricing norms" (GB50500-2008) is issued, marking China's pricing model to offer by enterprises pricing models. Based on the above background, this according to Chongqing City Management College dormitory Lot II project design drawings, preparation of business standard. The Business Standard from their own level, combined with the actual project situation and the reference provided by the Party BOQ and geological exploration report, provide the Bill of Quantities form of the tender offer. Due to the volume of construction works bear a larger group of students for the new University City early arrival, we promise, in the building during the application of new technologies, new processes, new materials, new equipment, in strict accordance with the ISO9002 quality system, to secure completed within the stipulated period of the project. Keywords: Project Overview;BOQ;Tender documents;Guarantee period
|