需要金幣:![]() ![]() |
資料包括:完整論文 | ![]() |
![]() |
轉(zhuǎn)換比率:金額 X 10=金幣數(shù)量, 例100元=1000金幣 | 論文字數(shù):7714 | ![]() | |
折扣與優(yōu)惠:團購最低可5折優(yōu)惠 - 了解詳情 | 論文格式:Word格式(*.doc) | ![]() |
摘要:本工程為重慶科技學院新校區(qū)(東區(qū))A組團,該項目地處重慶市沙坪壩區(qū)大學城。重慶科技學院是該項目的建設單位,工程由中國重慶蜀益建筑設計院有限公司設計,施工圖紙齊全。基礎結(jié)構(gòu)采用人工挖孔樁基礎。 該工程設計規(guī)模:重慶科技學院新校區(qū)(東區(qū))A組團,總建筑面積5606.02平方米。使用性質(zhì)及建筑類別:5層公共建筑,結(jié)構(gòu)類型為框架結(jié)構(gòu),抗震設防烈度六度。耐火等級二級,使用年限50年。本工程擬定工期為186個日歷天。 設計依據(jù):建筑工程設計合同和甲方提供的設計任務書;重慶市沙坪壩區(qū)建設委員會對初步設計批復,重慶市公安局消防局對初步設計已批復,重慶市沙坪壩區(qū)市政管理委員會對初步設計已批復,重慶市沙坪壩區(qū)防雷中心會初步設計已批復。 由于該工程工期較緊,為使工程盡早安全完工。我方一旦中標,全面調(diào)度公司的人、財、物,積極推廣應用新技術(shù)、新工藝、新材料、新設備,嚴格按照ISO9002質(zhì)量體系運行。貫徹施工技術(shù)規(guī)范、操作規(guī)程,實施全面質(zhì)量管理。精心組織、科學管理,確保實現(xiàn)各項承諾目標。 關(guān)鍵詞:框架結(jié)構(gòu) 設計依據(jù) 中標措施
ABSTRACT:His works for the new campus of Chongqing Institute of Technology (Eastern) A group, the project is located in Shapingba District of Chongqing University City. Chongqing Institute of Technology is the project's construction unit, construction by the China Architecture Design Institute Co., Ltd., Chongqing Sichuan Yi design, construction drawings are complete. Infrastructure uses a hand-dug pile foundation. The project design scale: Chongqing Institute of Technology Campus (Eastern) A group, with a total construction area of ??5606.02 square meters. Nature of the use and construction Category: 5 floors of public buildings, structure type for the frame structure, seismic fortification intensity six degrees. Fire resistance rating of two, the useful life of 50 years. The project intended duration of 186 calendar days. Design basis: construction and design contracts provided by Party design task book; Shapingba District, Chongqing Construction Committee approved the preliminary design, the Chongqing Municipal Public Security Fire Bureau on the preliminary design has been approved, Shapingba District, Chongqing Municipal Administration Commission for preliminary design approval, Shapingba District, Chongqing lightning Protection Center will preliminary design approval. Keywords: Frame construction;Design basis;Successful measures
|