需要金幣:![]() ![]() |
資料包括:完整論文 | ![]() |
![]() |
轉(zhuǎn)換比率:金額 X 10=金幣數(shù)量, 例100元=1000金幣 | 論文字數(shù):8102 | ![]() | |
折扣與優(yōu)惠:團購最低可5折優(yōu)惠 - 了解詳情 | 論文格式:Word格式(*.doc) | ![]() |
摘要:本畢業(yè)設計內(nèi)容為重慶城市管理學院學生宿舍C棟投標文件編制。該工程位于重慶市沙坪壩區(qū)虎溪鎮(zhèn)大學城,建設單位為重慶城市管理學院,由重慶大學建筑設計研究院設計,施工圖紙齊全。本工程采用獨立基礎,主體工程為磚混+局部框架結(jié)構(gòu),結(jié)構(gòu)安全等級為二級,抗震設防烈度為六度,工程類別為四類,共五層,樓層高度15.8米,建筑面積2446.69平方米 本畢業(yè)設計的內(nèi)容包括,重慶城市管理學院學生宿舍C棟所有土建和鋼筋的軟件算量,以及首層土建和鋼筋的手工算量。所用到的軟件有廣聯(lián)達鋼筋算量軟件、廣聯(lián)達圖像算量軟件、廣聯(lián)達計價軟件以及天正CAD等;手工算量用到的資料有《平法圖集2011》、《透過案例學平法》等。在此次畢業(yè)設計中遇到的最大的困難是對土建算量的不熟悉,但是通過查閱相關(guān)資料,以及老師的耐心指導和同學的幫助,使我克服困難,同時也使我的畢業(yè)設計得以順利進行。本次畢業(yè)設計最大的收獲是對鋼筋的算量有了一個非常具體的認識,這要得益于在手工算量中遇到的各種問題,伴隨著這些問題的一一解決也使我對鋼筋的算法有了一個非常清楚的了解。 關(guān)鍵詞:商務標 工程量 工程造價
ABSTRACT:This works for the Chongqing City Management College student hostels, Shapingba area of Chongqing is located in Tiger Town, University City. The project construction units for the Chongqing City Management College, engineering, architectural design by the Institute of Chongqing University, the design, construction drawings complete. Infrastructure, the use of hand-dug pile foundation. The upper part of the main for the brick, local framework structure, the structural safety of grade II, for the six seismic fortification intensity, type of construction work for the four categories. There are 5 layers overground building is 15.8 meter and it’s construction area is 2446.69 square meters. The preparation of tender documents by the Chongqing City Management College student hostels of the construction contract and construction design drawings, national and local construction and the existing series of technical specifications, standards-based, The preparation of tender documents by the Chongqing Institute of Technology (West) A group of student hostels Section II of the construction contract and construction design drawings, national and local construction and the existing series of technical specifications, standards-based, the construction for the local engineering and environmental characteristics, project requirements, to ensure reasonable and feasible measures to focus on. Adhere to the scientific order the capital program and construction, the use of sub-network technology, stratified flow process, a reasonable construction of the order of arrangement and construction plans to ensure that the construction schedule. Due to the volume of construction works bear a larger group of students for the new University City early arrival, our once successful, comprehensive scheduling the company's human, financial, and material, and actively promote the use of new technologies, new processes, new materials, new equipment, strict run in accordance with the ISO9002 quality system. Carry out the technical specifications of construction, and operation procedures, the implementation of total quality management. Careful organization, scientific management, to ensure that the commitments to achieve the goal. Keywords: Bidding; Quantity; Building Cost.
|